Purchase of property: $2,444,160.13
Phase I: $6,076,000 Development Costs
Size of buildings at the NP
Field house: 5,456 SF with picnic shelter
2,600 SF of covered picnic shelter
Shingled building with concrete floors and split faced brick exterior walls
Maintenance building: 1,860 SF
Metal roof building with concrete service bays and tile office/common areas
Open Air Storage building: 2,400 SF
Metal roof with concrete floors
Total Acreage at NP for Phase I: 58.6 acres
Fields: Eight lighted multi-use sport fields. Four fields sized for rugby (225’ x 465’) and 4 fields sized for soccer (225’ x 330’)
Acreage of mowing: 50 acres
Acreage of playing fields: 23 acres
Ponds: 6 acres used for irrigation. Well replenished.
Parking Lot: 3 acres, 417 spaces
Plantings: 358 trees, 350 shrubs, and 728 daylilies'
General contractor: Burney and Burney
Subcontractors:
Sports Fields: Nolan Thomas & Company
Sports Fields Lighting: Wheeler
Landscape and Nursery: Redmill landscape & Irrigation
Asphalt and Sidewalk: Home Run Construction
Fencing: Frye Fencing Company
Signs: AOA Signs
Rock Hauling: Mebane Trucking
Water/Sewer/curb and gutter paving: Harrelson & Smith Contracting
Electric: Wheeler Electric
HVAC: Eneco East, Inc.
Plumbing: Josh Bradshaw Plumbing
Site Surveyor: HC Harris, Jr. Engineering & Surveying