Repair and Renovation Capital Plan      
Project Overall Priority Cost R&R Category
Howell Science - Replace HVAC System (Mold Problem) 1 $9,407,266 MEP
Fletcher Music - Repair/Replace Storm Drain 2 $87,641 LAND
Wright Circle Infrastructure and Fountain Repair 3 $412,903 MEP
HSC- Replace Exhaust Fans at Brody Penthouse 4 $465,869 MEP
Campus Sewer Repairs 5 $400,646 MEP
Ward - Connection to Central Chilled Water Plant 6 $302,989 MEP
Steam Plant Repairs 7 $590,486 MEP
Austin Building Roof Replacemnt 8 $220,536 ROOF
Professional Plaza - Replace Storm Water System 9 $99,385 LAND
Reroof Mamie Jenkins Building 10 $35,088 ROOF
Wright Circle - Mill and Repave 11 $22,787 RWD
Rivers Building, DOI Renovations 12 $26,970 FIRE
Various Academic Building HVAC Repairs 13 $504,755 MEP
Steam Distribution System Steam/Condensate Expansion Joint Repairs 14 $142,302 MEP
Steam Plant Fuel Oil Tank Replacement Phase I 15 $134,170 MEP
Electrical Distribution Upgrades - Phase III 16 $1,208,420 MEP
Founders Drive - Mill and Repave 17 $35,954 RWD
Joyner Library Building Roof Replacement 18 $452,477 ROOF
Rawl Building Roof Replacement 19 $217,862 ROOF
Ormond Way - Repair and Repave 20 $83,583 RWD
HSC Replace Roofs 21 $1,063,424 ROOF
HSC Upgrades Elevators 22 $1,238,591 MEP
Whichard Building Window Replacement 23 $233,411 STRUCT
Steam Plant Floor/Roof Repairs 24 $154,296 STRUCT
Wright Auditorium Ceiling Repair Project 25   STRUCT
$62,221
Upgrade Fire Alarm System to Addressible @ HSC 26 $217,406 FIRE
HSC Replace Brody Roof 27 $666,504 ROOF
Jenkins Art HVAC Repair 28 $1,779,994 MEP
Brewster Elevator Repairs 29 $200,794 MEP
Campus Backflow Preventor Installations 30 $60,004 MEP
Various Campus Building Plumbing Repairs I 31 $729,241 MEP
Howell East Elevator Repairs 32 $155,290 MEP
Minges Coliseum - Repair & Repave Service Rd 33 $27,341 RWD
Faculty Way - Repave 34 $33,033 RWD
Mall - Repair Storm Drainage 35 $156,503 LAND
HSC Brody Masonry Repairs - Phase II 36 $403,753 STRUCT
HSC Upgrade Two Classrooms in Brody 37 $248,464 UAB
Jenkins Art Exterior Envelope Project 38 $702,425 STRUCT
Graham Building Window Replacement Project 39 $138,767 STRUCT
Ragsdale Building Roof Replacement 40 $234,306 ROOF
HSC HVAC Upgrades 41 $781,418 MEP
Upgrade Chillers @ HSC 42 $770,237 MEP
Steam Plant-Repave Roadway & Service Area 43 $23,617 RWD
Willis Building - Repave Service Drive 44 $41,853 RWD
Spilman/Bate Buildings - Storm Drain Replacement 45 $177,787 LAND
Various Campus Buildings Sprinkler System Installations 46 $1,035,511 FIRE
Howell Science North/South Glass Piping Repairs 47 $555,004 MEP
Mall Area Lighting Improvement 48 $361,825 MEP
Graham Building, DOI Renovations 49 $117,469 FIRE
Speight HVAC Repairs 50 $953,568 MEP
Spilman Building Roof Replacement 51 $107,461 ROOF
Messick Theatre Arts Building Roof Renovation & Replacement Project 52 $156,046 ROOF
Messick Theatre Arts Building Window Replacement Project 53 $166,222 STRUCT
Wright/Ragsdale Area-Replace Storm Drain 54 $60,097 LAND
Duncan Court - Repave 55 $10,853 RWD
Dowell Way - Repave 56 $8,179 RWD
HSC Renovate Brody Auditorium 57 $559,043 UAB
HSC Security Upgrades 58 $173,925 UAB
Graham Electrical Repairs 59 $84,291 MEP
Austin/McGinnis Electrical Repairs 60 $204,660 MEP
Various Campus Buildings Plumbing Repairs II 61 $100,131 MEP
Various Campus Buildings Electrical Repair 62 $449,440 MEP
Steam Plant Diesel Tank/Fuel Oil Lines Replacement 63 $150,320 MEP
HSC Upgrade No. 1 Boiler 64 $347,255 MEP
HSC Electrical Upgrades 65 $549,308 MEP
Spilman Building, DOI Renovations 66 $157,024  
FIRE
Bloxton Building Window Replacement Project 67 $39,556 STRUCT
Brewster - Correct Structural Defiencies 68 $1,351,964 STRUCT
Brewster - Replace Storm Drain 69 $40,782 LAND
HSC Grounds Improvements 70 $307,993 LAND
Steam Plant Fuel Oil Tank Replacement Phase II 71 $325,525 MEP
Steam Distribution System New Steam Line 72 $4,518,493 MEP
Steam Tunnel Steam/Condensate Piping Repairs 73 $990,252 MEP
Wright/Wright Annex HVAC Repairs 74 $4,767,840 MEP
Steam Distribution Center Condensate Tanks/Sump Repairs 75 $301,883 MEP
Laupus Lake-Repair and Replace Path around Lake 76 $18,719 LAND
Tyler/Belk Residence Halls - Repave Connecting Road 77 $11,088 RWD
HSC Pavement Repair and Replacement 78 $262,750 RWD
HSC ADA/DOI Upgrades 79 $150,320 FIRE
HSC Upgrade Ultrapure Water System 80 $131,686 MEP
Ragsdale Hall, DOI Renovations 81 $317,645 FIRE
Howell - Correct Structural Deficiencies 82 $815,790 STRUCT
Eller Building Window Replacement 83 $31,816 STRUCT
Eller, International, Taylor Slaughter House DOI Renovations 84 $72,279 FIRE
Rawl HVAC Repairs 85 $2,542,848 MEP
Spilman HVAC Repairs 86 $1,080,710 MEP
Joyner West HVAC Repairs 87 $762,854 MEP
Replacement Steam & Condensate Lines from Bate to Rivers 88 $2,676,400 MEP
Trustees Way and Chancellors Way - Repave 89 $46,673 RWD
Beckwith Drive - Repave 90 $11,688 RWD
Ficklen Drive - Partial Repave 91 $19,410 RWD
HSC Upgrade West Academic Building 92 $541,007 UAB
HSC Upgrades Academic Buildings 93 $498,791 UAB
Emergency Generator Upgrades @ HSC 94 $621,159 MEP
Messick Theatre Arts Center, Correct DOI Deficiencies 95 $253,433 FIRE
Fletcher Music - Correct Structurual Deficiencies 96 $531,849 STRUCT
Austin - Correct Structual Deficiencies 97 $1,174,680 STRUCT
Central Chiller Plant - Chiller Addition Phase I 98 $1,292,275 MEP
Brewster - Connection to Central Chilled Water Plant 99 $215,347  
MEP
Fletcher Music Center, DOI Renovations 100 $66,286 FIRE
Austin - Connect to Central CHW Loop 101 $215,347 MEP
Graham Building Elevator Addition 102 $774,124 ADA
="Alumni Drive - Remove & Replace with Pedestrian Sidewalk/Landscaping ">Alumni Drive - Remove & Replace with Pedestrian Sidewalk/Landscaping  103 $123,199 RWD
Cotton Hall - Replace Storm Drain on South Side 104 $11,926 LAND
10th Street North - Pedestrian Crossing 105 $123,601 LAND
Speight - Correct Structural Deficiencies 106 $497,257 STRUCT
Rawl - Correct Structural Deficiencies 107 $998,838 STRUCT
Bate - Correct Structural Deficiencies 108 $1,484,565 STRUCT
Spillman Building Elevator Addition 109 $500,808 ADA
Sewer Cross Connection 110 $120,194 MEP
Speight - Connect to Central CHW Loop 111 $215,347 MEP
Central Chiller Plant - Chiller Addition - Phase II 112 $3,846,396  
MEP
Electronic Door Access Project 113 $648,426 UAB
Leary Court - Repave 114 $7,579 RWD
Replace CW Coils @ Brody AHU 4, 5, & 6 115 $496,927 MEP
McGinnis - Connect to Central CHW Loop 116 $215,347 MEP
Rawl - Connect to Central CHW Loop 117 $215,347 MEP
Wright - Connect to Central CHW Loop 118 $215,347 MEP
Graham - Connect to Central CHW Loop 119 $215,347 MEP
Ragsdale Building Elevator Addition 120 $500,808 ADA
Maintenance Warehouse - Improve Parking Lots, Walks and Drives 121 $88,169 RWD
Replace Heat Wheels at Brody Penthouse, AC-1 and AC-7 122 $559,043 MEP
Fletcher Music New Steam Supply 123 $579,685 MEP
Spillman - Connect to Central CHW Loop 124 $215,347 MEP
Whichard Building Elevator Addition 125 $500,808 ADA
Whichard - Connect to Central CHW Loop 126 $215,347 MEP
Memorial Gym Roof Renovation 127 $58,130 ROOF